Investments

 

Renovation work in the terminal is scheduled for the end of the season. In 2016, improvements have been made in the following areas:

  • Total renovation of the terminal:

 

  • Total renovation of the recording area with the establishment of 14 new banks , all equipped with treadmills, facilitating the management of baggage and reducing passenger waiting times;

  • Reorganization of the filtering inspection station control area to improve passenger flow, thus reducing the waiting time;
  • Expansion of the boarding area;
  • Relocation and expansion of the store;
  • Total renovation of toilets for passenger comfort;

 

  • A new ergonomically redesigned and signage will be installed to improve passenger experience inside the terminal.